Steel industry valuation in India: the Steel & Metals playbook

Steel plants, rolling mills and metal units cost a lot to build. Their profits swing with the cycle. Many end up in CIRP. This playbook shows how their value is measured and defended.

Last updated

~₹11,000 crdebt of Uttam Galva steel plants valued
Pan-IndiaHindalco reinstatement valuation
Engineerson site for every plant

Steel industry valuation usually rests on the plant: blast furnaces, DRI kilns, rolling mills and captive power. A running plant is valued with the income and cost approaches. A stressed or idle plant is valued asset by asset on depreciated replacement cost. We then test three cases: a restart, a sale as a going concern and a piece-by-piece sale.

When does steel & metals need a valuation?

TriggerWhat is neededRule or source
Steel or metal plant goes into CIRPFair value and liquidation value for each asset classCIRP Regulations, 2016
Insurance renewal for a large plantReinstatement value of plant and buildingsPolicy terms
Metal prices fall or capacity sits idleImpairment test of the CGUInd AS 36
Lender restructuringAsset and enterprise valuesLender policy
Sale of a plant or unitEnterprise value and technical due diligenceTransaction

Which valuation method fits?

Asset or situationApproach we use
Operating integrated plantDCF on spreads and how much of the capacity is used, cross-checked with replacement cost
Idle or partly running plantDepreciated replacement cost, with a restart case and a piece-by-piece sale case
Captive power inside the plantValued with cases for what it depends on (see the Power playbook)
Stocks of raw material and finished steelNet realisable value at today’s prices

Why does a steel plant in CIRP need an asset-by-asset approach?

When a steel plant enters CIRP, its past earnings mostly show the distress. They do not show what the plant can do. Bidders price the furnaces, mills and utilities they would take over. They also price the cost to restart them. So we build the value up from the assets, which our engineers inspect. We show the restart case and the piece-by-piece case side by side for the committee of creditors. Read the steel plant case study.

What if sanctions or markets, not the plant, caused the failure?

A maker of goods became insolvent after economic sanctions cut it off from its market. The plant itself was sound. So the key question for lenders was how to split the value of the plant from the lost access to its market. Read the case study.

How do you insure a plant spread across India?

For Hindalco Industries we did a reinstatement valuation for insurance. It covered assets across India. The sums insured then matched the cost to rebuild each site at today’s prices. They no longer leaned on old book values.

Pitfalls we see most often

  • Using book values for insurance. The cost to replace a metal plant moves with steel and equipment prices.
  • Leaving out restart cost. Idle furnaces and mills need relining, repairs and approvals before they can run.
  • Missing what the plant shares. Power, oxygen and water plants are often shared.
  • Overlooking old technology. Older plant has functional obsolescence even when it still runs.
FAQ

Questions clients ask us

How is a steel plant valued under IBC?

Most often asset by asset, after a site visit. We use depreciated replacement cost. We test a restart case and a piece-by-piece sale. We report fair value and liquidation value, as the rules ask.

Can you value a steel company as a going concern?

Yes. We use a DCF on spreads and capacity use, cross-checked with asset values.

Do you value metal plants for insurance?

Yes. This includes reinstatement valuation of plants on many sites, such as Hindalco’s.

Which steel-sector mandates has RNC handled?

One was Uttam Galva’s steel plants, with about ₹11,000 crore of debt. We also did impairment work for APL Apollo. And we did a reinstatement valuation for Hindalco.

Get a quote

Request a steel & metals valuation proposal

Tell us what needs valuing and why. You will hear back from a partner, not a sales desk.

  • Scoped proposal with fee and timeline, usually within one business day
  • Conflict check and NDA before any data changes hands
  • Reports signed under IBBI registration IBBI/RV-E/02/2020/123